What works we perform.

A powerful cold supply system for poultry processing is necessary for all cycles of heat treatment of meat and affects not only the productivity but also the quality of the finished product, its cost. An individual approach to the choice of refrigeration equipment is required for each stage of production:

For the stage of cooling the trunks after slaughter, liquid cooling systems and ice water production are used. Chillers consist of a refrigerator and a film evaporator.

Freezing of poultry meat is carried out in special shock freezing chambers with the subsequent transportation in low-temperature storage chambers.

By-products obtained in the production process can be frozen in plate freezers or cooled after packing in special chambers with subsequent storage. Enterprises specializing in egg production can be supplemented with a storage chamber and a melange freezing chamber.

It should be noted that all production facilities of such enterprises according to sanitary norms must have a temperature not higher than +14°C, and the air flow rate should not exceed 0.2-0.5 m/sec, which makes the issue of air conditioning quite acute.

Example of a project.

Cooling systems for processing and storage of berry products.

Project example

of a cooling system for berry products processing and storage


    Comprehensive solutions for refrigeration systems for poultry farms.

    We offer comprehensive calculation, design, supply and installation of systems for cooling, freezing and storage of poultry products using innovative and energy-efficient technologies.

    Our experts will help you evaluate different types of refrigeration  systems, select the most efficient and cost-effective technical solution that will meet your long-term maintenance requirements and budgets. We provide a warranty on the equipment from the manufacturer and the work performed.

    How we work.

    Now

    Tell us about your
    project, request a consultation

    In 24 hours

    We will contact you and approve a tech
    task

    In 2 days

    We will develop
    a commercial
    offer

    In 1 week

    We will do the
    estimate and select
    equipment

    In 1-5 days

    We sign the contract and schedule our
    work

    In 1-2 months

    You get
    a ready-made
    object

    Our partners.

    Do you have a project or an idea?

      Select file