What works we perform.

Enterprises of the milk-processing industry always have special requirements for technological equipment. This is especially true for equipment that has direct or indirect contact with the finished product (intermediate coolant based on an aqueous solution of propylene glycol, water).

Units such as plate heat exchangers, film evaporators must have a special design with the use of stainless steel, the composition of which is regulated for such use.

Depending on the technological process at the enterprise, cold consumers at milk-processing plants are variable in terms of refrigeration capacity. Some operations of the technical process of milk processing can reach very high values ​​of heat release, which then need to be "cooled" in a short period of time (“peak loads”). These parameters must always be taken into account.

To compensate for the cost of the project, refrigeration equipment is selected taking into account the main components, such as “film evaporator” and/or “ice storage”. They are calculated based on such “peak loads” of the milk-processing factory. The cooling system is designed with less than the calculated peak cooling capacity (load). This allows to accumulate the necessary supply of ice for a short period of time, which will be used to cool the process in peak loads. At other times, the cooling system may operate to provide other cooling processes in the production.

Example of a project.

Cooling systems for processing and storage of berry products.

Project example

of a cooling system for berry products processing and storage


    Comprehensive solutions for refrigeration systems for milk-
    processing enterprises.

    We offer comprehensive calculation, design, supply and installation of systems for cooling liquids, film evaporators, ice batteries, refrigeration equipment for storage, cooling and freezing.

    Our experts will help you evaluate different types of refrigeration systems, select the most efficient and cost-effective technical solution that will meet your long-term maintenance requirements and budgets. We provide a warranty on the equipment from the manufacturer and the work performed.

    How we work.

    Now

    Tell us about your
    project, request a consultation

    In 24 hours

    We will contact you and approve a tech
    task

    In 2 days

    We will develop
    a commercial
    offer

    In 1 week

    We will do the
    estimate and select
    equipment

    In 1-5 days

    We sign the contract and schedule our
    work

    In 1-2 months

    You get
    a ready-made
    object

    Our partners.

    Do you have a project or an idea?

      Select file